12-02-2006, 09:03 PM
If Egg moved to D-2 on the 29th than he wouldn't be able to start building until the next day the 30th.
So not sure what day he moved onto D-2. If it was the 29th, than it will be done tonight.
If he moved there the 28th, it would have finished last night.
(Just trying to help Burter out but he'll probably post either way >.<)
So not sure what day he moved onto D-2. If it was the 29th, than it will be done tonight.
If he moved there the 28th, it would have finished last night.
(Just trying to help Burter out but he'll probably post either way >.<)


![[Image: WarakoSig.gif]](http://i35.photobucket.com/albums/d173/BeefyKeithy/WarakoSig.gif)